Intermittent Bonded Ribbon Production Line Available For Sale
A specified speed of 600 m/min gives this equipment considerable production capacity for optical-fiber applications. Prospective buyers should confirm the achievable speed, machine setup, and required operating conditions directly with the manufacturer before proceeding.
Shanghai Weiye OFC supplies equipment designed specifically for producing rollable ribbons containing 12 or 16 fibers. Its product description presents the equipment’s capabilities, technical specifications, and included systems, providing U.S. buyers with a basis for comparing their equipment requirements.
Review the listed configuration in the product description, then contact the supplier about pricing, installation, and options specific to your project. This approach helps determine which equipment details apply to your particular manufacturing site and goals.
The listed address for Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. is 201 Minyi Road, Songjiang District, Shanghai. Use the product page for initial reference and verify current technical and commercial information directly with the company. Submitting a clear request for pricing and specifications can help you move forward with the assessment.
Intermittent Bonded Ribbon Fiber Draw Tower Fiber Secondary Coating Line
Important Points To Consider
- The stated operating speed is 600 m/min, although the manufacturer should confirm the applicable conditions.
- The machinery is intended to manufacture rollable ribbons containing 12 or 16 fibers.
- The product listing describes machine capabilities, technical specifications, and supplied systems.
- Ask the supplier to clarify costs, installation arrangements, and requirements unique to your project.
- The supplier provides a business address in Songjiang District, Shanghai.
Intermittent Bonded Ribbon Production Line Overview
According to the supplier, the equipment is designed for rollable IBR configurations containing 12 or 16 fibers. Its product page specifies a construction speed of 600 m/min and a fiber diameter of Ф245 μm ±10 μm. As these are manufacturer-listed values, confirm the actual production speed and relevant operating requirements directly with the supplier.
Intermittent Bonded Ribbon Production Line
Designed To Produce Twelve- And Sixteen-Fiber Rollable Ribbons
Two fiber-count options are supported by the configuration for manufacturing rollable ribbons. This provides a useful reference when buyers compare machinery against their required ribbon format, fiber dimensions, and material-handling arrangements.
How Intermittent Bonding Supports Flexible Fiber Arrangement
The patent’s design examples describe neighboring fiber subunits joined by adhesive bonds positioned at intervals. One illustrated spacing range extends from 10 mm to 1,000 mm. This differs from a continuously bonded structure in which the connection extends across the full ribbon length.
These intermittent adhesive connections allow the assembly to change from a relatively flat configuration into rolled, curled, or folded forms. The specified spacing illustrates the patented design concept rather than confirmed production-machine settings.
- Machine details: A choice of 12 or 16 fibers, a listed operating speed of 600 m/min, and a specified diameter of Ф245 μm ±10 μm.
- Patent example: Illustrative spacing between adhesive bonds of 10 mm to 1,000 mm.
- Design benefit: Flexible handling across several possible shapes.
Applications In Optical Fiber Cable Manufacturing
Adjustable fiber layouts may allow cable designers to combine convenient splice access with space-efficient packaging. The patented design keeps fibers arranged in order while permitting sections between bonded points to shift as the cable is assembled.
High Fiber Density And Compact Cable Designs
An optical fiber ribbon may remain flat during mass fusion splicing and subsequently fold or roll for installation in a smaller cable. Potential advantages described in the patent include smaller cable constructions and an increased ratio of fiber area to overall cable cross-sectional area. The results achieved in practice depend on the complete cable construction and its intended use.
Ribbon Organization For Efficient Fusion Splicing
The ribbon format enables organized handling at the splice location while allowing the subunits to move during cable assembly. For production material planning, the listed specifications include payoff reels accommodating 25.2 km and 50.4 km of fiber. These reel capacities can be compared with the facility’s cable-manufacturing needs and material-handling setup.
| Design detail | Possible application | Consideration for buyers |
|---|---|---|
| Flat fiber configuration | Fusion splicing of multiple fibers | Verify the needs of your splicing process |
| Folded or rolled format | Compact cable packaging | Examine the complete cable design |
| 25.2 km and 50.4 km capacity payoff reels | Material-handling preparation | Match the reel capacity to production operations |
Specifications And Performance Of The Production Line
Compare the equipment’s published performance figures with your manufacturing requirements before requesting a quotation. Installation preparations should also account for suitable reels and the utilities available at the production site.
Speed, Diameter, And Attenuation
According to the specifications, the construction speed reaches 600 m/min. The listed fiber diameter is Ф245 μm ±10 μm, with additional attenuation of ≤0.01 dB/km measured at 1550 nm. Ask the supplier to verify the testing conditions and achievable results.
Payoff And Take-Up Reel Compatibility
The payoff system accommodates two reel dimensions, and the maximum weight of a full reel is 10 kg. For take-up, the equipment accepts either a T-type reel or a fiber-optic reel. Verify that your selected reel configuration is compatible with the facility’s material-handling process.
Facility Utilities And Operating Environment
The machine requires a three-phase, five-wire electrical supply rated at 380 V ±10%. Its specified operating environment is enclosed, clean, dry, and protected from drafts, with temperatures of 15 to 25°C and relative humidity no higher than 85%. Utility requirements also include nitrogen at 7 bar and 99.99% purity, plus a compressed-air supply at 6 bar. Check all utility connections in advance of installing the equipment.
| Technical specification | Listed requirement | Planning note |
|---|---|---|
| Payoff reels | Payoff dimensions of Ф236 × Ф25.4 × 108 mm or Ф267 × Ф25.4 × 180 mm; full reel ≤10 kg | Check reel compatibility and maximum weight |
| Reel used for take-up | T-type reel: Φ410 × Φ50.8 × 391 mm, alternatively a fiber-optic reel | Verify the preferred reel format |
| Electrical and environmental requirements | Power supply of 380 V ±10%; temperature of 15 to 25°C; humidity ≤85% | Prepare a dry, clean, draft-free operating area |
| Gas supply | Nitrogen: 7 bar, 99.99% purity; air: 6 bar | Verify gas supply capacity before installation |
Equipment For Fiber Payoff And Gathering
Optical fibers are guided toward the forming section by the payoff and gathering components. Their control systems support consistent feeding and help protect individual fibers throughout handling.
Sixteen-Spool Payoff With Tension Control
The payoff assembly holds 16 spools and provides traversing along with separately adjustable tension settings. Each spool has a maximum weight capacity of 10 kg. The technical details list 0.4 to 2 N tension with ±0.02 N accuracy, together with a 550 W motor. Because a separate overview states 40 to 150 g with ±2 g accuracy, ask the manufacturer to clarify the correct values for your intended setup.
Fiber Guiding, Break Detection, And Electrostatic Control
U-groove guides, multi-groove gathering rollers, and anti-jump components channel fibers into the forming section. Operators receive alerts about fiber problems through break detection and alarm functions. Safe handling is supported by protective guards and a pneumatic clamping mechanism. At the fiber exit, a rod-style electrostatic dust collector is installed, while anti-static equipment helps manage dust along the gathering route.
| Equipment component | Specified details | Purpose |
|---|---|---|
| Payoff | 16 spools with a maximum of 10 kg each | Supplies fibers using traversing |
| Motor and tension system | Tension of 0.4 to 2 N, accuracy ±0.02 N; motor rated 550 W | Supports regulated payoff of fibers |
| Fiber guidance and safety features | Rollers with grooves, warning alarms, protective guards, and a pneumatic clamp | Directs fibers and supports safe handling |
| Electrostatic management | Rod-type dust collector and anti-static equipment | Helps reduce dust near fiber routes |
Precision Molding And Intermittent Adhesive Dispensing
The ribbon-forming platform allows operators to control the mold position and placement of adhesive. Available adjustments help configure the process for each required ribbon format.
Adjustable IBR Mold Platform For Ribbon Formation
Ribbon formation uses three mold assemblies, each capable of holding up to five Nordson EFD jet valves. Operators can position the mold within 0 to 15 mm and adjust its base temperature from 20°C to 60°C. Precision valve groups mounted on sliding tables allow fine positioning and accurate application of adhesive dots.
Configurable Nozzle Arrangements For Twelve- And Sixteen-Fiber Ribbons
For 12-fiber ribbons, the specified arrangement consists of 5+5+1 valves. The 16-fiber format is produced using a 5+5+5 valve layout. Operators can adjust adhesive-dot spacing and the number of dots through the interface to match the selected optical fiber ribbon design. A dedicated adhesive is required for the coating and curing stages.
| Process setting | Format With 12 Fibers | 16-Fiber Format |
|---|---|---|
| Valve arrangement | 5+5+1 valve configuration | 5+5+5 valve configuration |
| Mold positioning range | 0 to 15 mm adjustment | 0 to 15 mm adjustment |
| Mold-base temperature | 20°C to 60°C operating range | Temperature range of 20°C to 60°C |
UV-LED Curing For Bonded Fiber Ribbons
The curing assembly applies UV exposure in stages to harden adhesive throughout the fiber structure. Prospective buyers can assess the oven configuration and listed operating specifications to determine whether the equipment suits their production process.
Pre-Curing And Main Curing Stages
Pre-curing is handled by three specialized 800 W LED-UV ovens. Each oven processes fibers supplied by a separate mold group before the material reaches the main 6 kW post-curing oven. Adjustable shutters reduce potential UV leakage and nitrogen loss. Published specifications identify a dominant wavelength of 395 nm ±3 nm, a curing degree of at least 85%, and post-curing power of at least 2.5 kW.
Managing Nitrogen Supply And Curing Performance
Operators can manually regulate nitrogen pressure and flow. Automatic functions also start nitrogen delivery during startup and stop it at shutdown. At production speed under continuous stable conditions, the specified lamp-array power consumption is no more than 80% of total power. These specifications provide a reference for comparing equipment, although testing conditions should be verified with the supplier. Ask whether different adhesives or materials require adjustments to the settings.
Visual Monitoring, Capstan, And Take-Up
As fibers travel through the equipment, visual monitoring and steady winding support the maintenance of material quality. Buyers can use the listed specifications to assess whether the machine meets the demands of their cable manufacturing process.
Real-Time Inspection Of Fiber Colors And Adhesive Dot Placement
Real-time magnified views are displayed through the machine’s microscope and camera system. Operators can inspect optical-fiber color order and verify the presence of resin dots at individual dispensing locations. By examining the optical fiber ribbon during production, operators can detect potential issues ahead of winding.
Servo-Driven Traction And Precision Take-Up
A 1 kW AC servo motor powers the capstan’s Φ190 mm traction wheel. Metering accuracy is specified as better than 1‰. The adjustable tension range is 50 to 500 g, with control accuracy of ±5 g. Together, these settings support controlled movement and handling of the fiber ribbon.
Take-up operation is rated at 600 m/min with a spool weight limit of 30 kg. Servo-controlled winding and traversing systems help maintain consistent material placement. The cable pitch setting allows continuous adjustment from 1 to 6 mm. Position detection and direction changes are supported by a photoelectric sensor. Check the intended cable requirements and actual operating conditions with the manufacturer.
Production Monitoring And Electrical Control Systems
Clear control functions help production staff manage settings, monitor system conditions, and prepare smooth stopping procedures. The supplier identifies Siemens control equipment and Schneider Electric switchgear as components of the production line.
Operating The Production Line Through PLC And Touchscreen Controls
The ribbon production line uses Siemens S7-1200 and S7-1500 PLCs with a 10.4-inch Siemens touchscreen interface. Low-voltage switchgear is supplied by Schneider Electric. The system supports both interlocked operation across the full production line and separate operation of individual units.
Settings, Alarms, And Length-Based Stops
Through the touchscreen, operators can manage process settings, activate curing ovens, configure wire feeding, and view alarms. It also displays lamp operating hours, live lamp current, oven temperature, and the equipment’s accumulated operating time. The meter-counter calibration feature allows displayed counts to be aligned with the distance actually traveled.
Operators can program a target production length that triggers deceleration or shutdown. This provides a practical way to control the end of a cable production run. Ask the manufacturer to confirm control capabilities and setup requirements before placing an order.
| Control-system feature | Listed detail | Use |
|---|---|---|
| PLC controls and operator display | Siemens S7-1200 and S7-1500 PLCs with a 10.4-inch touchscreen | Configure settings and examine production data |
| Electrical components | Low-voltage switchgear from Schneider Electric | Supports electrical control operations |
| Monitoring and stopping | Lamp, oven, runtime, and meter information with preset length | Monitor production and stop or decelerate the equipment |
Ribbon Quality, Material Selection, And Process Compatibility
Adhesive selection affects both the consistency of coating application and the final product. Rather than recommending a general adhesive, the supplier specifies a formulation dedicated to the equipment’s coating and curing operations.
Dedicated Adhesive For Bonding And Curing
Separate valve switches on the pressurized adhesive supply let operators control individual feed paths. Adhesive flow to each dispensing point is managed using precision pressure-control valves. The specified air pressure is adjustable, with a required minimum of 0.5 MPa.
The adhesive lines are black to reduce the risk of UV-triggered reactions while the system operates and cures material. This protection is important because premature exposure may change adhesive properties before application to the fiber.
Confirm suitable adhesives, process parameters, and surface-finish requirements with the manufacturer before choosing materials for a secondary coating operation. Ask how the recommended adhesive performs under your intended application conditions and expected production length. Detailed manufacturing guidance can support consistent quality throughout setup and the completed run.
Equipment Installation Needs And Supplied Documentation
Ensure the workspace and utility supplies are ready before scheduling the machine’s installation. The supplier’s specifications provide guidance for planning the production site and supporting consistent operation of the fiber-optic machinery.
Facility Conditions And Buyer-Supplied Connections
Install the machinery in a clean, dry, enclosed environment protected from drafts. Maintain a room temperature of 15 to 25°C and relative humidity no higher than 85%. The installation also requires nitrogen supplied at 7 bar with 99.99% purity and an air supply rated at 6 bar.
Connection cables and cable trays are excluded from the supplied equipment. The buyer must arrange the principal power feed-in cable. Verify the available utilities and planned cable routes ahead of setup, especially if a secondary coating section is nearby.
Documentation For Operation, Installation, And Maintenance
The supplier includes documentation supporting machine installation, operation, and servicing. Inspect the supplied documentation before commissioning so personnel can organize tasks and obtain required materials.
- Instruction manuals, operating guides, and a general layout drawing
- Wiring and electrical schematic diagrams, plus installation and maintenance drawings
- Manuals for purchased parts and a list of wear parts for maintenance planning
The supplied records support preparation for commissioning and routine servicing of the cable production machinery.
Selecting A Ribbon Production Line That Matches Your Manufacturing Requirements
First determine which finished ribbon products your business plans to offer. The machinery supports 12F and 16F formats and has a stated construction speed of 600 m/min. Assess the stated capabilities against your planned range of products, throughput requirements, and projected cable orders.
Verify take-up reel compatibility before placing an equipment order. The standard IBR reel has dimensions of Φ410 × Φ50.8 × 390 × Φ310 mm, supports up to 30 kg, and provides cable pitch adjustment from 1 to 6 mm. Confirm that the listed reel dimensions, capacity, and pitch range are appropriate for your site and handling process.
Payoff reel compatibility also deserves attention. The listed choices include internationally standardized spools with capacities of 25.2 km, 50.4 km, and 63 km. Obtain the exact spool dimensions before ordering materials or planning the length of manufacturing runs.
Evaluate utilities, adhesive requirements, and operator-monitoring capabilities alongside production speed. Assess whether the equipment arrangement is appropriate for fiber cable, loose tube, or the specific application in your cable production process. Discuss machine configuration and commissioning arrangements with Shanghai Weiye before committing to the purchase. Checking equipment suitability in advance can reduce the likelihood of costly changes after purchase.
| Planning point | Listed detail | Required buyer verification |
|---|---|---|
| Formats and speed | 12F, 16F; specified speed of 600 m/min | Compare with target production and product mix |
| Take-up configuration | 30 kg maximum capacity; adjustable pitch from 1 to 6 mm | Verify that the reel and site arrangements are suitable |
| Payoff spools | Capacities of 25.2 km, 50.4 km, and 63 km | Verify exact spool dimensions |
Request A Quote For The Intermittent Bonded Ribbon Production Line
For U.S. manufacturers, the equipment provides 12F and 16F configurations, a listed construction speed of 600 m/min, and dedicated machinery for forming optical fiber ribbons. Use these specifications to determine whether the machine is appropriate for your intended cable application.
When requesting a quotation, provide the required ribbon format, expected output volume, preferred reels, and available site utilities. Also describe the fiber type and handling requirements so Shanghai Weiye can evaluate the proposed configuration.
Before ordering, verify adhesive compatibility, the specified LED wavelength of 395 nm ±3 nm, and the published curing performance. Ask the supplier how these parameters relate to the chosen materials and required surface quality.
Use the manufacturer’s product listing to examine the equipment information. Contact Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. to confirm machine configuration, delivery arrangements, and commissioning requirements. The supplier provides its address as 201 Minyi Road, Songjiang District, Shanghai. Telephone 021-60701630 to discuss your manufacturing requirements. A detailed quotation inquiry helps define the next steps in purchasing.